« Back to all projects

Renovation, John Cochran VA Medical Center Supply Processing and Distribution, Department of Veterans Affairs

JW Fuller delivered a complete renovation of the existing Supply Processing and Distribution department, including the construction and logistics of a temporary SPD facility to be sued during the remodel. The work required installation of new mechanical systems and new electrical systems. Highly technical sterilization equipment was furnished and installed.  The temporary SPD building consisted of nine temporary building modified to fit into one 8,000 square foot space. This space was constructed and furnished with equivalent state of the art equipment as the new SPD department. Owner required a fully functional building to run a fully scheduled staff without disruption to surgery schedules. The temporary facility was set in place and fully operational within 90 days.