TVA Paradise

Upgrades, Tennessee Valley Authority Paradise Fossil Plant

This project included the complete removal of two existing belt feeders and the installation of two new mass flow gates and hydraulic power units. Extensive work was done to modify the existing hoppers, tail pulleys, and conveyor system to align with the new mass flow gates. The project was complete in an around the clock effort during a one week shutdown period. The project was completed on time and within budget with no lost time accidents.